Engineering · Safety · Renewables

Multi-Disciplinary Engineering
for Canadian Infrastructure

From solar PV design and power systems analysis to BESS, EV charging, lighting simulation, and health & safety governance — one firm, P.Eng accountability, coast to coast.

6
Service Lines
10+
Software Tools
P.Eng
Sealed Deliverables
🍁
Pan-Canadian
🏛 P.Eng Licensed in Ontario
📐 ETAP · HelioScope · PVsyst · DIALux
ESA & AHJ Compliant Drawings
🛡 COR Safety Programs
NREL PVWatts® Powered

The Gates We Open For You

Without a P.Eng stamp, your project doesn't move. Without proper safety documentation, you don't get on site.

🔏
P.Eng Licensed
Municipalities require P.Eng sealed electrical drawings before issuing permits. No seal = no permit, no interconnection, no occupancy.
Utility Interconnection
Net metering and grid-tied solar require P.Eng stamped single-line diagrams and connection agreements.
🏦
Financing & Insurance
Lenders, insurers, and investors require engineer-certified documentation before releasing funds.
🏗
ESA & Code Compliance
The Electrical Safety Authority requires P.Eng involvement for complex installations and new builds.
Legal Liability Protection
P.Eng stamped deliverables establish duty-of-care documentation and protect all parties.
🛡
Site Safety Access
Contractors can't mobilize without COR-aligned safety plans, LOTO procedures, and arc flash documentation.

Free Solar Feasibility Study

Enter your address and electricity consumption. We query the NREL PVWatts® V8 API — the same tool used by solar engineers and the U.S. Department of Energy — and return instant results on system size, generation, savings, and available Canadian incentives.

  • PV system size (kWp)
  • Annual generation vs. consumption chart
  • Estimated annual savings (CAD)
  • Federal + provincial rebate analysis
  • Payback period estimate
  • Guided next steps for BESS, EV, efficiency
Get My Free Solar Study →

Takes 60 seconds. No commitment. Instant results.

Sample Output — 10,000 kWh/yr · Ontario
System Size
8.2
kWp
Annual Savings
$1,370
CAD/yr
Rough Cost
$24,600
installed
After Greener Homes
$19,600
net est. cost
Illustrative example only. Actual results vary by site, consumption, and program eligibility.

Six Disciplines, One Firm

Every service category has the same rigour: industry-standard software, detailed workflows, professional review, and transparent pricing.

View All Services & Workflows →

From Concept to Commissioned

Every project follows the same rigorous methodology — regardless of service type.

1
Discovery
15-min consult. Understand your site, goals, and timeline.
2
Assessment
Site data, utility info, drawings, and field conditions.
3
Design
Simulation software, layout, system sizing, and optimization.
4
Permit
P.Eng sealed drawings, AHJ submission, reviewer liaison.
5
Commission
Construction support, commissioning witness, and turnover.
Start with a Free Solar Study →
or book a 15-min consult directly →

Engineer of Record & Owner's Engineer

A named P.Eng embedded in your project from Day 1 — covering design accountability, health & safety governance, and construction-phase oversight so nothing falls through the cracks.

⚙️
Engineer of Record (EoR)
A named P.Eng assumes full accountability. Stamped drawings, code compliance, AHJ liaison from submission through permit approval.
🔍
Owner's Engineer (OE)
We sit on your side of the table — reviewing contractor submissions, verifying quality, and protecting your investment.
🛡
H&S Engineering Oversight
Safety embedded in engineering from day one. Arc flash studies, LOTO procedures, and site-specific safety plans.
What We Deliver
  • Sealed electrical & civil drawings
  • Ontario Electrical Safety Authority (ESA) submissions
  • Utility interconnection packages (net metering, DER)
  • Code compliance review (CEC, NBC, local amendments)
  • Contractor tender evaluation & scope validation
  • Shop drawing and submittal review
  • Site visits and construction progress reports
  • Commissioning witness and turnover verification
  • Site-specific safety plans aligned to engineering scope
  • Arc flash hazard analysis (IEEE 1584 / NFPA 70E)