Power distribution design, panel schedules, lighting layouts, fire alarm coordination, low-voltage systems, and P.Eng stamped permit drawings for construction.
A full package includes: single-line diagram, panel schedules, load calculations, lighting layout, power plan, fire alarm coordination, low-voltage pathways, equipment specifications, and a code compliance report, all P.Eng stamped and permit-ready.
In Ontario, any electrical installation in a building requires plans prepared or reviewed by a licensed P.Eng or C.E.T. under P.Eng supervision. ESA (Electrical Safety Authority) requires stamped drawings for permits on commercial and industrial projects.
| Certification | P.Eng sealed (PEO) |
|---|---|
| Coverage | All Canadian provinces |
| Tiers | Basic, Standard, Premium |
Last updated: March 2026