Emergency and standby generator sizing, transfer switch design, fuel system specification, and CEC Section 46 compliance for life safety and critical power.

How do I know what size generator I need?

Generator sizing is NOT simply adding up all connected loads. You must account for motor starting inrush (typically 6× running current), non-linear load derating (1.5-2× for UPS/VFD loads), and sequential loading strategy. Undersizing causes voltage collapse on motor starts; oversizing causes wet stacking on diesels (minimum 30% loading required).

Key Deliverables

Open transition vs closed transition ATS?

Open transition (break-before-make) has a brief power interruption during transfer, acceptable for most loads with short ride-through capability. Closed transition (make-before-break) provides seamless transfer with no interruption and is required for sensitive loads like data centres. Closed transition requires utility approval for momentary parallel operation.

CertificationP.Eng sealed (PEO)
CoverageAll Canadian provinces
TiersBasic, Standard, Premium

Last updated: March 2026